How to Use the Concrete Sidewalk Calculator
- Measure the walk length along its center, and the width at its widest. A curved walk can be split into sections.
- Choose the thickness. Four inches is the usual choice for foot traffic.
- Enter the size and read the order. Short walks fit in bags, and long walks usually need a truck.
- Plan the joint spacing so cracks form where you want them.
Concrete Sidewalk Formula
A sidewalk is a long, narrow slab.
cubic yards = length (ft) × width (ft) × thickness (in) ÷ 12 ÷ 27
cubic yards per 10 ft of walk = 10 × width (ft) × thickness (in) ÷ 12 ÷ 27
- Length: The distance along the walk, in feet.
- Width: The walk width in feet. 3 to 5 ft is common.
- Thickness: In inches. Four is typical for foot traffic.
Metric: In metric, enter lengths in meters. A 4 inch walk is about 100 mm.
Worked Example: A 50 ft Walk, 4 ft Wide and 4 Inches Thick
A 50 ft front walk, 4 ft wide at 4 inches thick.
50 × 4 × (4 ÷ 12) = 66.67 ft³; ÷ 27 = 2.47 yd³
With 10% waste: 2.72 yd³. Order 2.75 yd³ of ready-mix, or 123 bags of 80 lb (163 of 60 lb). Estimated cost at default prices: about $800 in 80 lb bags, or $533 ready-mix.
Concrete per 10 ft of Sidewalk by Width
Cubic yards and 80 lb bags for each 10 feet of walk, 4 inches thick, with no waste. Multiply by the length ÷ 10.
| Walk width | yd³ per 10 ft (4 in) | 80 lb bags per 10 ft (net) | yd³ per 10 ft (5 in) |
|---|---|---|---|
| 3 ft | 0.37 | 17 | 0.46 |
| 4 ft | 0.49 | 23 | 0.62 |
| 5 ft | 0.62 | 28 | 0.77 |
Bag counts are net and rounded up per 10 ft section. Add waste, and round the whole walk once.
How Much Concrete for Common Sidewalk Lengths
Order size and bags for a 4 ft wide walk at 4 inches thick.
| Size | Net volume (ft³) | Order (yd³) | 80 lb bags | 60 lb bags |
|---|---|---|---|---|
| 10 ft long | 13.33 | 0.75 | 25 | 33 |
| 20 ft long | 26.67 | 1.25 | 49 | 66 |
| 30 ft long | 40.00 | 1.75 | 74 | 98 |
| 50 ft long | 66.67 | 2.75 | 123 | 163 |
| 75 ft long | 100.00 | 4.25 | 184 | 245 |
| 100 ft long | 133.33 | 5.50 | 245 | 326 |
| 150 ft long | 200.00 | 8.25 | 367 | 489 |
| 200 ft long | 266.67 | 11.00 | 489 | 652 |
Control Joint Spacing
Concrete shrinks as it cures, so it cracks. Control joints, cut or tooled into the surface, give those cracks a straight line to follow. On a sidewalk a common spacing is every 4 to 5 feet, or about the width of the walk, which also gives the neat square pattern most people expect.
Joints need to be about a quarter of the slab thickness deep to work, and should be cut or tooled soon after finishing. Follow your contractor and local practice.
Sidewalk Thickness
Four inches is the usual thickness for a walk used by people. Use five or six inches where a vehicle will cross the walk, such as at a driveway apron. A compacted gravel base under the walk helps drainage and keeps it level.
See the concrete slab thickness guide for how thickness changes by use.
Curves, Steps and Slopes
A curving walk is measured along its centerline. A walk with a slope still takes the same volume, but forms are harder to set, so allow 10 to 15% waste. Add a stairs section for any steps along the way.
Mistakes That Leave You Short
- Measuring the straight distance between ends instead of the length along a curve.
- Forgetting a thicker section where a vehicle crosses, such as a driveway apron.
- Using the narrowest width for the whole walk when it flares at the door.
- Skipping control joints, which lets the slab choose where to crack.
- Using bags for a long walk. A 100 ft walk is about 1.5 yd³, which is a lot of bags.
Related Calculators
- concrete slab calculator
- concrete patio calculator
- concrete curb calculator
- concrete bag calculator
- concrete slab thickness
See every tool on the all concrete calculators page.
Concrete Sidewalk Calculator FAQs
How much concrete do I need for a sidewalk?
Multiply length × width × thickness in feet and divide by 27. A 50 ft walk, 4 ft wide and 4 inches thick, is 66.67 ft³, or 2.47 yd³ net. With 10% waste, order 2.75 yd³ or 123 bags of 80 lb.
How thick should a concrete sidewalk be?
Four inches is the usual thickness for a sidewalk used on foot. Use five or six inches where a vehicle will cross, such as a driveway apron. A compacted base of gravel under the concrete helps. Check local code, because some places set a minimum thickness for public walks.
How many bags of concrete for a 20 ft sidewalk?
A 20 ft walk, 4 ft wide and 4 inches thick, is 26.67 ft³ net. With 10% waste, that is 49 bags of 80 lb, or 66 bags of 60 lb. That is about 1.09 yd³, so bags are reasonable.
How far apart should sidewalk control joints be?
A common spacing is every 4 to 5 feet, which is also about the width of a standard walk. Joints should be about a quarter of the slab's thickness deep, and are cut or tooled soon after finishing. Your contractor or local code may call for something different, so confirm before you pour.
How much does a concrete sidewalk cost?
Concrete alone for a 50 ft, 4 ft wide, 4 inch walk is about $533 in ready-mix or $800 in 80 lb bags at default prices. The full cost is higher with excavation, base, forms, finishing and labor. Enter your local prices above for a better estimate.
Should I use bags or ready-mix for a walkway?
For a walk under about 1 yd³, bags are practical, and that is roughly 30 ft of a 4 ft wide walk. Longer walks are easier and often cheaper with a truck, if it can reach. A 50 ft walk is 2.72 yd³ with waste.
Written by Maddy · Last reviewed November 1, 2026 · How we calculate · Report an error