Skip to main content

Editorial Standards

The rules every calculator and guide on this site follows, and what you can hold us to.

Last reviewed November 1, 2026

Who writes and checks the pages

Maddy builds and checks every calculator and writes every guide. We do not list credentials we cannot back. Pages say "Written by Maddy" and show a last reviewed date. If a second person ever reviews a page, their name appears on it. See About Maddy.

How numbers are produced

  • Volumes are plain geometry. The formulas are on each page and on the methodology page.
  • Bag yields come from manufacturer data sheets. Density, waste (10% default) and the rounding rule live in one place, so a number is identical on every page.
  • Every worked example on a page is checked by hand against the calculator.

How we cite standards

We cite ASTM and ACI documents only for what they actually say. ASTM C94 defines ready-mixed concrete and its delivery limits. ASTM C143 is the slump test method. ACI 318 is the structural building code, so we cite it for structural minimums only. A common estimating rule of thumb, like a 10% waste allowance, is called that and is never presented as a code requirement.

Prices

Prices are editable estimates, current as of October 2026, and each states its date. We refresh price data every January and whenever a source changes. Your local quote always wins.

Corrections

When a number or claim is wrong, we fix it and list it in the public corrections log. Report one on the report page.

Estimates, not engineering

Results are estimates. Site conditions and local codes decide the real quantity and design. See the disclaimer.

Ads and independence

The calculators are free. If we show ads, they never change a result, and we do not accept payment to recommend a product or supplier.