How to Use the Concrete Slab Cost Calculator
- Measure the length and width of the slab in feet, and decide its thickness. Four inches suits most patios and walks.
- Enter the size. Leave waste at 10% unless the ground is rough.
- Type your local prices into "Price per bag" and "Ready-mix per yd³". The defaults ($150 per yard, $6.50 per 80 lb bag) are estimates from October 2026, not quotes.
- Compare the two cost boxes. Add your own costs for base, forms, rebar, labor and finishing to get the full job price.
Concrete Slab Cost Formula
Cost starts with volume, then multiplies by price. Ready-mix is billed by the quarter yard with a possible fee, and bags are billed per bag.
ready-mix cost = order (yd³, rounded up to 0.25) × price per yd³ + short-load fee
bag cost = bags (rounded up) × price per bag
slab materials per sq ft = thickness (in) ÷ 12 × (1 + waste) ÷ 27 × price per yd³
- Order (yd³): Net volume plus waste, rounded up to the next 0.25 yd³.
- Short-load fee: A flat fee some suppliers add to small deliveries. We assume $120 under 5 yd³. Yours may differ or not apply.
- Price per bag: The shelf price of one bag of the size you pick.
Metric: For a slab in meters, enter lengths in meters. The calculator converts to feet and shows cubic meters as well as cubic yards.
Worked Example: A 20 × 20 ft Slab, 4 Inches Thick
A 400 sq ft slab, 4 inches thick, for a small garage or large patio base.
20 × 20 × (4 ÷ 12) = 133.33 ft³ net. With 10% waste: 146.67 ft³ = 5.43 yd³, rounded up to 5.50 yd³
With 10% waste: 5.43 yd³. Order 5.50 yd³ of ready-mix, or 245 bags of 80 lb (326 of 60 lb). Estimated cost at default prices: about $1,593 in 80 lb bags, or $825 ready-mix.
Materials Cost per Square Foot by Thickness
Concrete materials per square foot at our default prices (October 2026), with 10% waste. This is concrete only. Excavation, base, forms, rebar, labor, finishing and delivery fees are extra, so installed prices are higher. Get local quotes for those.
| Thickness | Ready-mix $ per sq ft | 80 lb bags per sq ft | 80 lb bags $ per sq ft |
|---|---|---|---|
| 3.5 in | $1.78 | 0.53 | $3.48 |
| 4 in | $2.04 | 0.61 | $3.97 |
| 5 in | $2.55 | 0.76 | $4.97 |
| 6 in | $3.06 | 0.92 | $5.96 |
| 8 in | $4.07 | 1.22 | $7.94 |
Ready-mix at $150 per yd³ and bags at $6.50, both editable estimates. Ready-mix looks cheaper per sq ft because bags cost more per cubic foot.
Concrete Cost for Common Slab Sizes (4 Inches)
Order size, bags and the concrete-only cost at default prices for common slabs.
| Size | Net volume (ft³) | Order (yd³) | 80 lb bags | 60 lb bags |
|---|---|---|---|---|
| 8 × 8 ft | 21.33 | 1.00 | 40 | 53 |
| 10 × 10 ft | 33.33 | 1.50 | 62 | 82 |
| 10 × 12 ft | 40.00 | 1.75 | 74 | 98 |
| 12 × 12 ft | 48.00 | 2.00 | 88 | 118 |
| 12 × 16 ft | 64.00 | 2.75 | 118 | 157 |
| 16 × 20 ft | 106.67 | 4.50 | 196 | 261 |
| 20 × 20 ft | 133.33 | 5.50 | 245 | 326 |
| 24 × 24 ft | 192.00 | 8.00 | 352 | 470 |
What Drives Slab Cost Up
The concrete itself is usually a minority of the cost of a finished slab. The bigger swings come from the job around it.
- Thickness: every extra inch adds about a quarter of the volume of a 4 inch slab.
- Site access: a truck that cannot reach the pour means a pump or wheelbarrows, and both cost money.
- Base and prep: excavation, hauling away soil and compacted gravel are often priced separately.
- Reinforcement and joints: rebar or mesh, and sawing or tooling joints, add materials and labor.
- Finish: a plain broom finish costs less than exposed aggregate or stamped concrete.
- Season and region: prices and delivery fees vary by supplier and by time of year.
Bags vs Ready-Mix Cost for Small Slabs
At 1 yd³ the two are close. 45 bags of 80 lb cost about $293 at our default price, and a 1 yd³ ready-mix order with a short-load fee costs about $270. Below that, bags win on cost and convenience. Above it, the price gap and the labor of mixing 45+ bags favor a truck.
Enter your own two prices to see where your break-even really sits. Short-load fees and minimum orders are the number most likely to change the answer.
Delivery and Short-Load Fees
Many ready-mix plants set a minimum load. Orders under it can carry a short-load fee, a delivery charge, or both. Policies differ by supplier, so call two plants and ask for the minimum, the fee and the time allowed on site before extra charges apply.
This calculator assumes a $120 flat fee under 5 yd³ as a placeholder. If your supplier quotes something different, a result using your numbers is more useful than ours.
Mistakes That Leave You Short
- Comparing a ready-mix price per yard with a bag price per bag without converting both to the same volume.
- Leaving out the short-load fee on a small ready-mix order.
- Pricing the concrete but not the base, forms, rebar and labor, which can outweigh the concrete.
- Using the exact volume instead of the order volume, so the budget is a little short.
- Assuming an old price. Refresh prices before you budget, especially for ready-mix.
Related Calculators
- concrete cost calculator
- concrete slab calculator
- concrete bag calculator
- concrete driveway calculator
- concrete patio calculator
See every tool on the all concrete calculators page.
Concrete Slab Cost Calculator FAQs
How much does a concrete slab cost?
It depends on size, thickness, finish, access and your region, so this calculator prices the concrete only. At our default prices, a 400 sq ft slab at 4 inches needs about 5.50 yd³ and costs about $825 in ready-mix. Add base, forms, labor and finishing for the full job.
How do I calculate the cost of a concrete slab?
Find the order volume in cubic yards, then multiply by the price per yard and add any short-load fee. For bags, multiply the bag count by the price per bag. The calculator above does both from your length, width and thickness, using prices you can edit.
Is it cheaper to pour a slab with bags or ready-mix?
Under about 1 yd³, bags are usually cheaper because ready-mix adds short-load fees. From 1 yd³ up, ready-mix is usually cheaper and saves hours of mixing, if a truck can reach the pour. Enter your real prices above to check your own numbers.
What is a short-load fee?
A short-load fee is an extra charge many suppliers add when an order is smaller than a full truck or the plant's minimum. It can be a flat amount or a per-yard charge, and policies vary. We assume $120 under 5 yd³ as a placeholder. Ask your supplier for their exact policy.
How much concrete do I need for a 20×20 slab?
A 20 × 20 ft slab at 4 inches is 133.33 ft³, or 4.94 yd³ net. With 10% waste that is 5.43 yd³, so order 5.50 yd³ of ready-mix. In bags, that is 245 bags of 80 lb, far too many to mix by hand, so a truck is the practical choice.
Does this calculator include labor?
No. It prices the concrete only, in two ways, so you can compare bags and ready-mix. Labor, excavation, base material, forms, rebar, finishing and permits are separate and vary a great deal by region and contractor. Use the result as your materials line and get local quotes for the rest.
Written by Maddy · Last reviewed November 1, 2026 · How we calculate · Report an error